ج) پروژه هاي Piping و برودتي :
10-مجتمع سرد خانه 1100 تني
C)Piping and Rifrigeration projects
10-1100 tons Freon cold Storage Project
Client: The Rural Cooperative Toonekabon Co. Consist of: -Isolation and installation of machinery -8 each compressors 15 hp(DWM COPELAND) -4 cold stores for kiwi fruit storage Duratine: -3 months in 2003
Client:
The Rural Cooperative Toonekabon Co.
Consist of:
-Isolation and installation of machinery
-8 each compressors 15 hp(DWM COPELAND)
-4 cold stores for kiwi fruit storage
Duratine:
-3 months in 2003